September 13, 2026
A big week. Planning and Delivery gained a calendar, and the rest falls into
three: how paid time is classified, what a route carries with it, and which work
a dashboard counts.
The calendar sits beside the table and the Gantt, showing a whole month or
one roomier week, with your filters and saved views carried across as they are.
Each order is one bar: its planned dates are the outline, and what actually
happened is the bar inside it.
Pay types is the other new one. Set your company's classifications up in
Settings, then split each day's hours across them, so a nine-hour entry can be
eight hours Regular and one hour Overtime. A person assigns the split; we never
infer it from the clock, because when overtime starts is your agreement to make.
The check-in/out export carries a column per type, so payroll adds the columns up
instead of reading a split back out of one cell.
A duplicated route now arrives complete, with its materials and its stage
locations on it. A quantity held at route level can be edited or moved to a
stage on its own, and the bill of materials exports as numbers with unit names
beside them, so you can total it in the spreadsheet you opened it in. Importing
materials or parts says how many rows landed and closes the window when it is
finished.
On dashboards, the Configuration tab now holds the phases your shop reports
on, and every tab reads against that set for everyone who opens it. Hours and
headcount split by union code or cost code, both taken from the session itself,
so a week reads with the codes it was worked under even for someone whose
classification changed later. A department's first-pass yield counts its own
phases, each department tab keeps its own phase filter, and an order finished on
its due date counts as on time whatever the hour.
Elsewhere: QR labels you can print for racks and bins and scan from a phone,
components as delivery cargo for shops whose routes don't use phases, larger form
entry exports that finish with every page and every photo in them, and a
Smartsheet push that finds a row it has lost track of and re-links it rather
than adding a second one beside it.
New
You can now tell us how your company classifies paid time, and say how much of
each day goes to each classification.
Set your list up in Settings › Company › Pay types: Regular, Overtime,
Double Time, or whatever your payroll uses. Each one has a name and a short
code, and the switch at the top of that card turns the whole thing on. Leave it
off and your timesheets carry on as they are.
Open a day on Insights › Timesheets and there is a Pay Types tab beside
Check-in/out. Each check-in/out entry gets its own split: the entry's paid time,
how much you have assigned so far, and how much is still missing. Type the hours
against each type, or use + Fill to put the whole remainder on one of them.
A nine-hour entry can be 8h Regular and 1h Overtime, which is the split payroll
actually wants. It saves with the entry, so fixing a time and reclassifying it
is one save.
Every day is assigned by a person. We never guess the split from the hours
worked, because when overtime starts is your agreement to make, not ours.
A day with an entry that is not fully assigned says Missing Type in red on
the grid, and Show errors only brings those days up with the rest of your
errors.
The check-in/out export carries a column per pay type per day, in hours, in
both the Excel and CSV downloads. Payroll can add the columns up instead of
reading a split back out of one cell.
Retiring a type leaves your history alone. Deactivate it and it stops appearing
on new days, while the days already using it keep it and keep exporting it.
Rename a code and the days using it are updated to match.
If you pull time through our API, your list is readable there and each
check-in/out record carries its split.
New
Planning and Delivery now open on a calendar beside the table and the Gantt. It
shows a whole month, or one week with more room in each day, and your filters and
saved views carry across as they are. Nested shows your orders and Flat shows the
work inside them, the same rows the table shows, and a phase or stage is labelled
with the order it belongs to. The calendar reopens on the month you left it.
Each order gets one bar, the way it gets one row on the Gantt. Its planned dates
are the outlined box, what actually happened is the bar inside, and its deadline
is a tick on it. A deadline that falls outside the plan sits at its own date on a
dashed line back to the bar. Hover any bar to read every date it carries,
including the ones that fall outside the month or week you are looking at. A
September order with a November deadline names that deadline on hover.
Date fields decides what lands on the grid. Planning starts on planned finish
and deadline, and you can add planned start, actual start or actual completion.
Choose a start and a finish together and the work stretches across the days
between them. Work that has started and not finished runs from its start through
today.
Delivery shows planned delivery, stop and transit windows next to expected dates,
ordered by time of day within each day.
Drag a bar to another day to move its planned dates, or drag the deadline tick
on its own to move just the deadline. Both work anywhere you could already edit
those dates. Planning applies the same scheduling rules it applies everywhere
else, so a move it would refuse in the table it refuses here. A day holding more
orders than fit shows how many are hidden, and opening it pages through the
rest.
New
A dashboard can now split weekly hours and headcount by the union code a
person held or the cost code their work was charged to, with a toggle to
switch between the two. Both come from the session itself, so a week reads with
the codes it was actually worked under, even for someone whose classification
changed later.
Cost code has its own view underneath. Click a code and you get the people who
charged it, the hours each of them put in, and how those hours ran week to week.
The two codes answer different questions and the numbers behave differently. A
person holds one union code, so those weekly counts add up to that week's crew.
A person can charge several cost codes in the same week and shows up under each
one, so that column counts people who touched the code rather than the crew
size. Hours split cleanly either way. Work with no code on it groups under
Unknown, so a gap in setup stays visible instead of disappearing.
Alongside this, the Hours page gained counts for people per week, average weekly
hours per person, and a production rate: the budgeted man hours of the work
finished in a period against the hours actually logged against that same work.
New
Print QR labels for department locations from Settings > Locations, Storage, or
location details. Select one or several locations, choose whether to include
sub-locations, and preview the labels before printing on a Letter sheet.
Attach labels to racks, bins, or workstations. Scanning one opens that location's
page, where workers can see its contents and use the actions their permissions
allow. Parent locations can show contents from their sub-locations, with each
stock row identifying its location.
The link stays the same when a location is renamed, and existing printed QR codes
continue to work.
Improved
The Configuration tab of the OTD Metrics dashboard has a new Reporting
Phases section. Pick a department to select all of its phases, or pick phases
one by one, and every number on the OTD, Executive and Department Head tabs is
reported against that set for everyone who opens the dashboard. Leave it empty
and the dashboard reports at the order level, as it does today.
The Phase and Department filters at the top of each tab still work the
same way for a single visit. When you pick one, it takes over from the
configured set until you clear it.
Phases cover their routes, so a shop that reports on Design gets every route
that produces a Design phase without picking each one. Reset All to Defaults
clears the configured phases along with the other settings on the tab.
Maintenance
Duplicating a route now carries over its materials as well as its stage locations: every input line and produce declaration, with the same quantities and units, placed at the matching stages on the new route. The source route is not changed.
New
A delivery normally takes cargo you have marked as a delivery phase. If your
routes don't use phases, that can leave you with an empty cargo picker and no
way to finish a delivery. There is now a company setting that adds components
as another cargo choice.
Turn on Allow components as delivery cargo in Settings, Company, under
Deliveries. Your cargo picker keeps phases marked as delivery phases and also
offers the smallest components in an order. A component that holds other
components offers those instead of itself, so the same work can't ride two
trucks. An order with no components in it is offered whole. Stages stay out,
because that is department work rather than something you put on a truck.
Deliveries that already have cargo are left alone. Turning the setting on or off
never rechecks a trip that is already planned or running, so nothing you have
loaded changes underneath you, and you can turn it back off at any time. It
starts off for everyone.
Maintenance
Quantities in Materials and route BOM Excel exports now work directly in spreadsheet calculations. You can add totals without first converting the quantity cells from text to numbers.
The same correction applies to numeric columns in pick list, delivery, and truck exports.
SKUs keep their leading zeros, and quantities that have no value remain blank.
Maintenance
Exporting form entries as printable forms gave you a PDF with one page in it.
The download succeeded and the file opened normally, so the missing entries only
turned up when someone read the document. It made no difference how many entries
you picked: five or two hundred produced the same single page.
The PDF is built by printing the preview page, and since late August that page
had been sized to the height of the browser window. Printing measures the
document, found one window's worth, and stopped there.
Printed exports now run to as many pages as the content takes. This covers the
printable forms download from Forms and Entries, the inspection and summary
PDFs, and the template PDF, which was cut the same way.
The Photos only download had a second problem, and an older one: since
mid-July the zip had been arriving with nothing in it, whatever photos the forms
held. The export reads the photos out of a copy of the entry data, and a change
in July switched that copy to carrying links to the photos rather than the files
themselves, so the export packed none.
Photo downloads now contain the photos, and the printable forms zip carries them
alongside the PDF. If you pulled photos any time since mid-July and got an empty
file, the export is worth running again.
Maintenance
Picking more than about fifty entries in Forms and Entries and exporting them
stopped with a message about a short link, and no file arrived. The export
records which entries you picked before it builds anything, and that record was
held in a field with a size limit. Fifty entries was the point where the list
outgrew it.
That limit is gone. Behind it sat a second problem. A large export could
download normally and open normally, with a PDF inside that held a single page
reading "The page got lost in the mix". The export builds its document by
loading the preview page, and for a large selection that page did not finish
loading in time, so the printer captured the error screen instead of the
entries.
The export now prepares the selection once and reuses it for the printed
document, which is what lets the preview finish. A 60-entry selection that
previously came back as that single page now runs to 232 pages.
If the preview cannot be loaded, the export now stops and reports the failure
rather than producing a file. Very large selections take several minutes to
print and can still reach the time limit. When one does, it stops with an error
instead of a download, and splitting it into smaller exports works.
All three ways out of Export selected forms are covered: Download PDF,
Images only, and Open in browser.
If you exported a large selection recently and found a one-page PDF inside, that
export is worth running again.
Maintenance
When a phase or component lost its link to its Smartsheet row, the next push
created a second row for it under the same parent, beside the row that already
represented it. Push now finds the original and re-links it. Where two rows
already claim the same node, or its row has sync switched off, the sync adds
nothing and says which rows to clean up. Duplicate rows created before this
release stay on the sheet and still need removing by hand.
A flat sheet whose rows had lost their link, for example after the integration
was reconnected, links those rows back to their existing orders on the next
sync.
Maintenance
An order, phase or stage finished at any time before midnight on its due date,
in the shop's time zone, now counts as on time on every Insights dashboard.
On-time delivery, days late and the on-time column in drill-down tables all
follow the same rule.
Until now, work finished in the evening on its due date could show as a day
late.
The shop's time zone comes from the shop the work belongs to. Work that is not
tied to a shop uses the company's time zone when all of its shops share one.
Maintenance
On the Department OKR Scorecard, each department tab's FPY % and Rework %
now measure the department's own phases: every phase of that department that
finished in the period, and whether any work inside it was sent back for rework.
The cards say so underneath, Phases completed in the period, and the trend
charts follow the same rule.
Until now a department's number was taken from whole jobs that happened to pass
through it, so rework in another department's stages showed up on its tab.
Click FPY % or Rework % on a department tab and the detail page lists the
phases behind the number, with the order, project, completion date and how many
stages were reworked, each with a link to open it. The Overview tab keeps
measuring whole jobs delivered in the period, and says so.
A department tab measures the phases named for it on the Configuration tab.
If a tab reads All phases under its Phase filter, set its phases there and
the numbers narrow to that department.
Maintenance
In a route's Materials & Production tab, you can now edit or remove the quantity shown at Route level, including what remains after assigning some to stages or steps. Editing or removing a row changes that row's quantity and the BOM total while keeping the other assignments.
To move part of a quantity, edit its row, choose a stage or step, and enter the amount to move. The total stays the same and the amount left stays on the original row. You can also keep your entire BOM at Route level.
Maintenance
Process routes with no stages of their own now show linked department-route locations without requiring you to scroll past a large blank area.
Improved
An inbound delivery now opens on the same page whether you start from
Logistics or from Inventory > Deliveries. The page shows what is
expected against what has arrived, with every quantity in its unit (for
example 60 EA). Receive sits at the top of the delivery's details, with
Edit and More below it. Export and Import sit above the lines,
and the schedule and stops are on the Itinerary tab.
Receiving fills in the itinerary for you. The first receipt marks the unload
stop as arrived, and the receipt that finishes the delivery marks it as
departed, so the dock shows as free for the next truck. You can still mark
arrival and departure by hand.
A short delivery stays open for the rest to arrive. If nothing more is coming,
Post and close records what did arrive and closes the delivery, keeping the
shortfall on the lines. If nothing arrived at all, No-show (under More)
records it as a vendor no-show, kept apart from a delivery you Cancel
yourself, so no-shows can be tracked by vendor. Once something has been
received, or the truck has been marked as arrived, it can no longer be recorded
as a no-show. A line that has received material stays on the delivery as the
record of what arrived and can't be removed. On a phone, the summary cards are
hidden so the lines come first.
Inbound deliveries can be changed after they are created. Edit opens the
same form you created the delivery with: name, vendor or origin address,
destination, PO number, expected arrival, unloading window, driver, truck and
receiver. Expected arrival is the day the truck is due; the unloading window is
the dock time shown on the Logistics board. Rescheduling from the Logistics
board works as before.
Adding a material that isn't in the catalog yet asks for its unit along with
its SKU and name. Each line's location links to that location's page.
Importing a packing list needs a destination location on the delivery, since
that is where received stock lands. A delivery without one now says so and
offers to set it. Mark received is offered only while there is something
left to receive and the delivery has lines, and the actions you see follow your
permissions.
Old links to the Inventory delivery page still open the delivery. Shops running
Logistics without Inventory keep the delivery's details and itinerary, with no
receiving lines.
Planning now shows delivery groups, and groups with no work in them yet,
while closed work stays hidden unless you filter for it. In Build, filtering
by project, person or dates no longer brings finished and closed work back onto
the board.
New
The Materials section on an outbound delivery's Cargo tab is now called Other
cargo, and it has one search field for anything going on the truck. Type a
name: pick a match from your inventory catalog (by SKU or name), add what you
typed as an item that isn't in inventory (tools, drawing rolls, a ladder), or
create it as a new catalog material on the spot. Each line is tagged with what
happens to its stock: "Takes from inventory", "Moves in inventory" on a
transfer, or "Not in inventory". For a catalog material the unit list offers
only that material's base unit and purchase unit, so the quantity that leaves
the building is taken out of stock in the right unit. Quantities now show
without trailing zeros (4, not 4.0000).
When the trip is completed, the delivered quantity of each catalog material comes
out of stock at the location it was loaded from, so on-hand counts reflect what
left the building. Ship-loose and consumable materials still appear on the
manifest and do not draw down stock.
A transfer between your own locations works differently: the delivered quantity
moves from the location it was loaded at to the location it was unloaded at, so
it stays in inventory. That includes a transfer to another shop. A transfer with
no unload location for a catalog material can't start until one is set.
The delivery sheet and the driver's page show the SKU and name for these lines,
so the person loading the truck and the person receiving it read the same thing.
The driver's page now also shows the notes you add to a line or a pack, such as
"return to the shop after unloading". The Confirm delivered dialog shows each
line's unit next to its quantity, and a delivery sheet printed after the trip
shows what was delivered against what was planned (3 / 4) where they differ.
On the driver's page, a stop on a delivery you confirmed from the office now
counts what was delivered instead of reading 0, and a delivered trip no longer
offers Undo depart.
The delivery's cargo summary and the Logistics list now count these lines as
"other items", so a truck carrying only other cargo no longer reads as empty.
Maintenance
When a worker clocks into a stage, the session takes the Cost Code set on that stage in Stages under Rules Engine. That code wins over one set on the order, phase or component above it, and time logged on a step inside the stage follows the same rule.
A stage with no cost code of its own falls back to the order's code, then the project's, as before.
Existing sessions keep the cost code they were given when they started.
Maintenance
Starting a form from Entries now opens it as soon as you press Save, the
same way it already does from Planning or from an order. Pick the template,
choose what it is linked to, add a category if your shop uses them, and the form
is in front of you ready to fill in.
Until now the new form stayed out of sight until you sorted or filtered the
list, so pressing Save looked like it had done nothing.
The Entries list also shows the newest entries first, so a form you started a
moment ago sits at the top when you come back to it. Sorting by any column
still works the way it did.
Maintenance
The location QR scanner now fits its window on your phone, in portrait or landscape. You can frame the code and reach the close button without scrolling around an oversized camera view.
The full-screen scanners in Build and Attendance keep their existing layout.
Maintenance
Exported bills of materials show each assigned unit's short name, such as LF, in the UoM column.
Lines without an assigned unit keep an empty UoM cell.
Maintenance
Importing a spreadsheet into Parts or Materials now confirms how many rows were imported and closes the upload dialog when there is nothing to review.
If the file has no data rows, the dialog stays open and asks you to choose a file with rows to import.
Maintenance
Importing materials into a route, an order, or a project take-off now shows how many rows were imported and closes the upload window when the import finishes.
If the file has no data rows, the window stays open and asks you to choose a file with rows to import.
Route BOM exports now use the current per-unit quantity shown on the route, rather than an older stored quantity. Per-order totals remain unchanged.
Importing a BOM now matches materials only within the selected route, order, or project. Materials already used elsewhere are added to the selected BOM without changing the other BOM.
If a material appears on more than one row of the sheet, those rows are combined into one line (their quantities add up) and the import tells you which rows were combined. On an order import, each row's stage still gets its own share.
Improved
A phase row in Smartsheet can now point at the phase that comes after it, in a
Successor column holding that phase's ID, the same Order ID the sync
already reads. The sync connects the two in BuildingSwell as a finish to start
connection inside their order, so an imported order's phases run in the
sequence the sheet gives them, the same way they would under a process route,
and a status from the sheet lands on the right phase.
A successor has to be a sibling row of the same order, and several can be
listed separated by commas. A value that is not one of them is left alone and
the activity log says which. If the cells would form a loop, nothing is written
for that order.
Changing a cell later moves the connection: the sync removes the one it made
before and adds the new one. A connection the sheet never named is never
touched, and a sheet without the column syncs exactly as it did.
An order row with a Route value and no rows under it still gets the route
when it is created, as before. The rows the sync then writes back for the
route's phases carry each phase's template, so the next sync reads them as the
phases they are.
An Order ID that is already in a cell stays there. When BuildingSwell's own
identifier for that row is different, the sync leaves the cell alone and says
in the run log how many rows it kept, so a number your team gave a row is never
replaced by a generated one.
Maintenance
Duplicating a route or an individual route stage now carries over its eligible locations, including the default location and the order of the alternatives. You can reuse a configured route without adding its stage locations again.
When choosing a stage location, you can now search by name or code instead of scrolling through the list.
The Locations tab also stops showing an endless loading animation on process routes that have no stages of their own.
Maintenance
Planning and Logistics keep the filters, columns and sort you set when you leave
the page and come back. Set a board up the way you want it, go check Staff
Overview or open an order, and it looks the same when you return.
Until now a board could come back to its default view instead of yours, so you
rebuilt your setup through the day. That no longer happens.
Maintenance
On the department scorecard, every tab now holds its own phase filter. Choose a phase on one department's tab and the other tabs stay as you left them, so two people can read two departments without moving each other's numbers.
Each tab's filter row also states what its numbers cover: the phases it is scoped to, or that it is showing every phase because that department has none set on the Configuration tab. That last case used to look the same as a scoped one, which made a company-wide number easy to read as one department's.
New
Timesheets has a new Check in/out view for people who split their day across
many orders: designers, detailers, programmers, project managers, foremen. Open
your row and the week lists the tasks with time on them. Type the hours you
spent on each one per day and you are done. No timer, no start and end times.
Building Swell places the time inside your shift and keeps your check-in in step
with it.
Type the hours the way you say them: "3h", "3.5h", "3h 23min", "90m", "1:30",
"1:30:00" or plain "2" all land as the same time, in a cell or in an imported
file. A file can also write a whole session in one cell, "09:00 - 10:00", the
way most time trackers export it. Every export now carries the worker's
identifier beside their name, and Import uses it to tell apart two people who
share a name.
A whole-day total works too. Type it on your own row and it is shared across the
tasks you already logged that day, in proportion. Typing less than what is
already logged asks first, then lowers the hours. Hours already logged on the
stages of an archived order can still be corrected.
Every session takes a comment. Open a day, hit Add comment under the task,
and say what the time went on, or write it in the session's own drawer, which
now has a Comment box of its own. Either way it shows up in the Sessions
table and both exports, so a lead reading the week gets the reason without
asking.
Click a task's name and the Update progress drawer opens on that stage,
the same one Build and Planning use, so ticking off steps happens where you
log the time, not in another module. Click a phase or component heading, or an
order's heading when its stages sit straight under it, and it opens on all of
its stages at once. It stays out of the way for anyone whose
role cannot mark progress.
Stages sit under their phase or component, the way Planning shows them. The
heading carries its ID, the order, its status and the project, and every stage
shows its own status, so nobody starts logging on a stage that is still
waiting. Fold the heading away and the whole group takes one number per day,
split across its stages in proportion to the hours already on them. Useful
when a phase has five stages and you only know the afternoon went to that
phase.
Each department sets its own Check-in Gap Threshold in Department
settings: how much of a checked-in day can go unlogged before the gap flag
appears. Everyone starts at 30 minutes, which is what the flag always used. The
same threshold holds back the no session hours flag, so someone who has just
checked in is not flagged before their first task starts.
Departments are no longer tabs. The view shows the whole organization, and
Department sits in Filters next to Team, Members, Orders, Stage and
Issues, so a person who works in two departments in one week is one row, not
two. Leads get a flag on each day that needs a look: no session hours, a gap
between the check-in and the logged time, more hours than the shift, or sessions
without a check-in. A day off, extra hours or a department closure shows on the
day with the reason on hover, and a full day off is never counted as missed.
Why a person is off shows only to people allowed to see their time off.
Companies that split paid time into pay types see the same Pay Types tab
and Missing Type mark here as on the classic view, and the export carries a
column per pay type.
One person can work in two departments on one day. Type the day's total and
the department with the earlier shift opens the day, the other one's hours
follow, and each gets its own check-in. The check-in cell shows the sum and
lists each department's span on hover; a task names its department only when
the week touches more than one. What a day cannot hold is two time zones:
hours typed on a task in another zone are refused with a note saying where the
day already sits, and an empty day in a week that spans two zones asks which
department's day it is when the schedule does not settle it. With a
Department filter on, a day with more hours in another department says so
under its total, so nobody tops up a four-hour day that was really eight.
Task list holds the stages your lead assigned you in Planning that are
still to do or started, newest first, and filters them by project, due date
and status. Its search box also finds a phase, component, order or project by
the ID Planning shows. Bring one into the week, or add any other stage by searching for
it, and it stays on the week whether or not it has hours yet: set up the
week's shortlist on Monday and fill in the time as the days go by. Adding a
task also assigns the person to it in Planning when your role can assign
people there. Removing a task from the week leaves that assignment alone, so
the task stays in the Task list for later. To find a stage, type its name with a word from its order or
phase, like "panel 12 weld", and it comes straight up. An order, component or
phase opens to show what it holds, and typing inside an order searches every
stage in it. With nothing typed, the search offers your recent
picks, your open assignments and the department's overheads. The day drawer's
Add work session uses the same search. Filter by department and the list shows that
department's work, so a designer picks from design stages instead of scrolling
past the welding. Export writes the week to a
spreadsheet, and Import reads the same layout back, including hours exported
from other tools. Importing a file you exported keeps each session's comment and
cost code, and changes only the sessions and comments you edited in it.
Anything a file skips or ignores, like a session still running, is listed
before the import closes. A row that would run longer than 16 hours is refused
with a note to add AM or PM, since 8:00 to 4:00 otherwise reads as 8 AM to 4 AM
the next day. One import takes up to 2,000 rows with hours, so split a bigger
file by week or department.
Your Check in/out filters and the 1 or 2 week setting follow you now instead of
staying in one browser, and you can keep a set of them as a view. Name it,
and it sits in the menu at the top of the page ready to switch back to. Share it
with a few people, a team, a role or the whole company, and they open Timesheets
already narrowed to the department and the week length you set up, without being
told which boxes to tick.
The Sessions export changes for everyone, whether or not this view is on: it
gains Worker Identifier after Name, Stage ID after Stage, and Comment at the
end. A spreadsheet that reads the export by column position needs to allow for
the new columns.
This view is switched on per organization as teams move over to it. Until then
your Timesheets look as they do today.
Improved
A form step on a route now takes either kind of form. Before, it only took
Pass/Fail forms. A questions-only form, the kind you use to record answers
rather than pass or fail a stage, could not be part of the standard route, so it
had to be attached to each pack by hand.
This matters most for location capture. A form that records where it was
submitted is usually a questions-only form, so until now you had to choose
between capturing the location and having the form on the route. You no longer
have to choose.
A questions-only form step reads Recorded once someone submits it, the same
as anywhere else in Forms. Pass/Fail steps are unchanged: they still show the
Overall check and still read Passed or Failed. And if a form is already used as
a step somewhere, you can now turn it questions-only without BuildingSwell
refusing the change.
A required form step still has to be filled before its stage can finish,
whichever kind of form it uses.
Improved
The updated plan-versus-actual dashboard report brings planned hours, actual hours, and progress together, with comparisons by week and project. Department comparisons sit alongside rework measures so you can review where work is taking more hours.
These changes apply when your organization’s dashboard is updated to the revised report. Rework counts stages that have been reworked at least once; it does not count repeated rework on the same stage.
Improved
Group a dashboard table and the grey summary row now reads each column the way that column is meant to be read. Hours and counts add up. Percentages and progress average across the whole group rather than being totalled. A reference column such as an order number stays blank, because there is no sensible way to add order numbers together.
Last Month is now one of the presets in the dashboard date picker, so you can look at the previous calendar month without typing in its first and last day. It covers the whole month, unlike This Month, which runs from the first up to today.
Improved
Dashboard drill-downs can now return you to the tab you came from, with a back button that names that tab. This applies to dashboards configured with a shared detail page and a return button.
Dashboard pages can also open with their own filter settings, so a department tab starts in that department’s scope.