Maintenance · Orders
September 17, 2026
Recording a produced part no longer needs a default location
When you mark parts as produced from an order's Materials & Production tab, Building Swell now works out where the finished part goes: the place the last run of that step put it, the part's default location, or the one location that already holds it. Before, a part with no default location refused to record and the only sign was "Some rows failed". When it still can't tell, the message now names the part so you know which one needs a location.
On the same tab, the Assign at list in Add line indents steps under their stage, so it reads the way the table is grouped.
Add to pick list now asks where the materials are staged when it creates a new list, so the list no longer arrives with staging Not set. Leave it empty and the picker chooses where each line lands when they pick it. When you add to a list that already exists, the same field still sets staging for just those lines.
Creating a pick list from the Pick Lists page no longer fills the staging location in for you when your shop has only one. Staging is where this order's materials go, which changes from job to job, so it is always yours to pick.